St Marys Industrial Project Overview

Scope

Over 500m of DN50 PE header pipes and 15000m of drip tubing installed to newly landscapes areas surrounding the industrial complex.

A hunter ICC controller with 30 separate irrigation zones.

Water is supplied from large rainwater tank capturing water from the extensive industrial roof area and backed up from a direct supply from the recycled water network

“ A expertly planned project with conduits and sleeves between all remote gardens, we were able to get in and get out with 4 days ”