St Marys Industrial Project Overview
Scope
Over 500m of DN50 PE header pipes and 15000m of drip tubing installed to newly landscapes areas surrounding the industrial complex.
A hunter ICC controller with 30 separate irrigation zones.
Water is supplied from large rainwater tank capturing water from the extensive industrial roof area and backed up from a direct supply from the recycled water network



