Auburn Golf Course Project Overview

Scope of works

Stormwater is harvested from the surrounding LGA area through diversion into Gross Pollutant Traps (GPT) for pre-screening.

  • Water is harvested from the pump station attached to the GPT’s at a rate of 60L/S to the 2 new 2ML dams onsite
  • From the dams a floating submersible bore pump is hung from a pontoon to deliver water to the existing golf course header tanks.
  • A water treatment system designed and constructed by us will deliver 18l/s to the future irrigation system.
  • A fully integrated PLC will digitally monitor the status of all pumps and components remotely for total system control.