Cooper Park Project Overview

Scope of works

  • Stormwater is harvested from a Creek bed just before it enter the Sydney Water Culvert which drains to Sydney Harbour
  • Water is pre-screen before entering the transfer pump station situated in creek bed off take
  • Water is then stored in 2x25kl above ground tanks storage tanks
  • Water is pumped via a VSD vertical multistage pump, it is screened to 50 micron and UV dosed before being distributed to the for field irrigation.
  • A full cloudmaster and hunter irrigation system to suit the new park was also installed.

Project gallery