Client:
Perfection Landscapes
Date of Works:
15 January 2016
Sector:
Parks and Open Space
Project Range:
$300 - 350k
Days to Completion:
50 days
Scope of works
Stormwater is harvested from the new sports field development and surrounding street scapes for reuse in irrigation.
- Water is pre-screened through a a series of pits with trash screens before it enters the 50kl raw water storage tanks
- From here the water is fine filtere and UV Screened on a waterform technologies pre packaged skid and delivered to the 200kl irrigation storage tank.
- A new dual 7.5kw VSD irrigation pump set is installed to handle the irrigation demand.
- 5 sports fields have been constructed with surrounding landscapes which are all irrigated.
- A subsoil drainage system was installed in the subgrade to harvest excess turf water.
- Neverstop also undertook the new gas and water service to the field as part of the complete hydraulics package.