Mason Park Project Overview

Scope of works

  • Stormwater is harvested from a 20000m2 adjacent Energy Australia site and extended catchment area via 300mm diversion line with offtake pit and penstock
  • Water is pre-treated via a humes GPT before entering the 100kl underground Stormtech storage tank which installed just above the water table.
  • a 10kl underground pump station with flygt pump to transfer to treatment shed
  • Water is screen filtered and UV disinfected before entering the irrigation header tank for reuse in irrigation
  • Asbestos removal and Acid Sulphate Remediation we employed as part of the bulk excavation works